Arguments




were submitted on Monday 24 November, the arguments against the decision of 4 September 2008 the Directorate General of Public Works, published in the DOGA n ยบ 178, dated Monday 15 September 2008, which is subject to consultations THE DIRECTOR OF HIGHWAYS PLAN OF GALICIA, KEY GA/05/178.00, which includes environmental sustainability report, GA/05/178.00 key.
This Plan provides the road network planning horizon Galician for 2008-2020 with the establishment of action programs in urban areas.
In the metropolitan area of \u200b\u200bVigo, Vigo called Sector Plan Integrated, comprehensive road plan key Vigo PO/06/009.00 area, which includes the splitting of the Rande Bridge AP-9 over a length of 1.56 km with a total cost of 154,195,360.00 euros and Extension of AP-9 stretch Vigo, Buenos Aires, Teis-Rande with a length of 4 km and total cost of 25,617,971.55 euros. Affect
Chapela, a town belonging to the municipality of Redondela, with a population of 10,000, since in the project include the addition of two lanes in each direction.

0 comments:

Post a Comment